Products

  • Intelligent detection of on-pole and g...

    Automation level: Seven test projects can be wired up at once, and all factory routine tests can be completed with a single click;

    Testing efficiency: Generally, we use four integrated test cabinets, and two testers can easily complete the product testing of 136 units in 8 hours a day. If we use the traditional testing mode to achieve this efficiency, we need at least 6 people and the work intensity is very high.

    Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

    The energized area and the operation area are completely separated, which can absolutely guarantee personal safety.

    All test items are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent detection of on-pole and g...

    Automation level: The routine factory tests are divided into high-voltage and low-voltage test areas. In the low-voltage test area, the direct impedance and insulation resistance are tested with one-time wiring, and the computer automatically completes the test process; in the high-voltage test area, the no-load test, induction withstand voltage, and power frequency withstand voltage are tested with one-time wiring, and the computer automatically completes the test process.

    Testing efficiency: The common configuration is 4 low-pressure workstations and 4 high-pressure workstations. 2 testers can easily complete the testing of 80 products in one day for 8 hours. If this efficiency is achieved in the traditional testing mode, at least 6 people are needed, and the work intensity is high.

    Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

    The energized area and the operation area are completely separated, which can absolutely guarantee personal safety.

    All test items are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent detection of new energy tr...

    Automation level: Routine factory tests are divided into high-voltage and low-voltage test areas. The low-voltage test area generally uses a mobile test vehicle for testing, and the computer automatically completes the testing process; the high-voltage test area can generally be designed as a fixed workstation or a flexible workstation, with one-time wiring for no-load test, induction withstand voltage, and power frequency withstand voltage, and the computer automatically completes the testing process.

    Testing efficiency: The common configuration is 2 low-pressure test vehicles and 2 high-pressure workstations. Two testers can easily complete the testing of 20 products in 8 hours a day. If this efficiency is achieved in the traditional testing mode, at least 4 people are needed, and the work intensity is high.

    Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

    Flexible testing can utilize existing vehicles for circulation;

    All test projects are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent testing of new energy transformers - integrated testing.

    Automation level: Including dual split transformers, all factory routine tests can be completed with a single connection and a single click;

    Testing efficiency: The common configuration is 2 test stations and 2 testers, who can easily complete the testing of 16 products in 10 hours a day. If this efficiency is achieved in the traditional testing mode, at least 6 people are needed, and the work intensity is high.

    Advantages: Easy to operate, no need for professional technicians, and can start working after simple training;

    The energized area and the operation area are completely separated, which can absolutely guarantee personal safety.

    All test items are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent detection of dry-type transformers - flexible testing.

    Automation level: Routine factory tests are divided into high-voltage and low-voltage test areas. The low-voltage test area generally uses a mobile test vehicle for testing, and the computer automatically completes the testing process; the high-voltage test area is for conducting no-load tests, induction withstand voltage, and power frequency withstand voltage one-time wiring, and the computer automatically completes the testing process.

    Testing efficiency: The common configuration is 2 low-pressure workstations and 2 high-pressure workstations. Two testers can easily complete the testing of 20 products in one day for 8 hours. If this efficiency is achieved in the traditional testing mode, at least 4 people are needed, and the work intensity is high.

    Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

    We can use the existing vehicles for transfer.

    All test items are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent detection of dry-type trans...

    Automation level: Routine factory tests are divided into high-voltage and low-voltage test areas. In the low-voltage test area, direct impedance and insulation resistance are tested with one-time wiring, and the computer automatically completes the test process; in the high-voltage test area, no-load test, induction withstand voltage, and power frequency withstand voltage are tested with one-time wiring, and the computer automatically completes the test process.

    Testing efficiency: The common configuration is 2 low-pressure workstations and 2 high-pressure workstations. Two testers can easily complete the testing of 25 products in 8 hours a day. If this efficiency is achieved in the traditional testing mode, at least 4 people are needed, and the work intensity is high.

    Advantages: Easy to operate, no need for professional technicians, and can start working after simple training;

    The energized area and the operation area are completely separated, which can absolutely guarantee personal safety.

    All test projects are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent detection of oil-immersed d...

    Automation level: Routine factory tests are divided into high-voltage and low-voltage test areas. In the low-voltage test area, direct impedance and insulation resistance are tested with one-time wiring, and the computer automatically completes the test process; in the high-voltage test area, no-load test, induction withstand voltage, and power frequency withstand voltage are tested with one-time wiring, and the computer automatically completes the test process.

    Testing efficiency: The common configuration is 4 low-pressure workstations and 4 high-pressure workstations. 2 testers can easily complete the testing of 60 products in one day for 8 hours. If this efficiency is achieved in the traditional testing mode, at least 6 people are needed, and the work intensity is high.

    Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

    The energized area and the operation area are completely separated, which can absolutely guarantee personal safety.

    All test items are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Intelligent detection of oil-immersed distribution transformers.

    Automation level: One-time wiring, and all factory routine tests can be completed with one click;

    Testing efficiency: Conventional use of 4 workstations, one tester can easily complete the product testing of 35 units in 8 hours a day. If this efficiency is achieved in the traditional testing mode, at least 4 people are needed, and the work intensity is high;

    Advantages: Easy to operate, no need for professional technicians, and can start work after simple training;

    The energized area and the operation area are completely separated, which can absolutely guarantee personal safety.

    All test items are tested by the host computer software, which can realize the paperless operation of the test station.


    View Details
  • Types of transformers that can be intelligently detected.
    View Details
  • NKT-IC Mobile iron core loss testing system.
    View Details

About Us

Survive through price and service, develop through professionalism and quality! We sincerely welcome friends from all walks of life to cooperate with us.

Dongying Nanke Electrical Co., Ltd. is located in Dongying City, Shandong Province, at the beautiful estuary of the Yellow River. It is a high-tech enterprise mainly engaged in the development, design, production, sales and after-sales service of professional automatic measurement and control systems. The company gathers a number of excellent engineers in various fields such as automation, electrical, electronic, computer and mechanical in China, and more than 90% of the company's employees have a college degree or above. Users are spread all over various provinces and cities across the country and in multiple countries.

View Details

东营南科电气

Project cases

News